This week I've been finishing off the roof.
I decided to take DS's suggestion and drybrush the roof. I drybrushed in Anita's Dusty Green colour, which is like a lighter shade of the Leaf Green I used on the roof. I started out on a little corner to see if I liked it, and was amazed at how it instantly brought the texture of the roof to life. So then I did it all over the roof. In this photo, I was trying to show the contrast between the area at the right (drybrushed up to chimney) versus the area above the bedroom cutout (not drybrushed) but it was hard to get it to show in a photo.
This is a closeup of a drybrushed area. You can see how the lighter colour picks up all the texture of the wooden shingles, and also defines the edge of each row. The extra shading makes the roof look less toy-like.
Then I had the pleasure of finally unwrapping all the cling film and bubble wrap from the house - like opening a Christmas present!
I had already spraypainted the trim with primer, so I gave it a few coats of first, white acrylic, and finally the white emulsion to match the house. I love the trick of resting the trim on pieces of dry spaghetti to stop it sticking to the table - wish I had known that one years ago.
I had previously traced around the roof peak onto a piece of paper, before I put the roof on, so that I would have a pattern to use when cutting the trim. I am using the same Houseworks trim that I used for the conservatory roof. I played around with it a bit to see how I could fit it into the roof peak, and also have an interesting finish at the bottom edge of the roof. Then I cut it carefully, and sanded the cut pieces to shape them into a natural looking curve.
Here are my three sets of trim, after I'd touched up the cut areas with white paint.
I glued my gingerbread trim underneath the roof, flush with the edge (as in the right of the photo) and then added a plain stick to trim the edge of the roof (as in the left of the photo). I used a trick Rik Pierce taught us when I took a workshop with him, which is to add dabs of super glue along the length of wood, in between the white glue, to give some instant grab while the white glue sets.
The trim on either side of the chimney, at the side of the house, stands out from the wall. I finished the gap at the top with another little bit of stick.
I'm quite pleased with the trim, it really brings the house to life. Once the glue has dried hard, I am going to go in and touch up the joins and cut ends with white emulsion.
Saturday, 25 September 2010
Sunday, 19 September 2010
Painting the Forth Bridge
No pictures this week as the only job I've been doing is painting the shingles when I get a chance. It's been a busy week, without much time for dollshousing.
For such a little house, painting the shingles has felt a bit like painting the Forth bridge: endless. I've done several coats, only to turn the house to a new angle and discover new unpainted crevices. I've just finished what I hope is the definitive and final coat, and I put a bright worklamp between my eyes and my paintbrush, so that I could look extremely closely at the roof and really work the paint into all the cracks.
DS is suggesting that I add some realism by drybrushing the roof in a different colour, or highlighting some of the shingles in different shades of green. I'm a bit worried that introducing too much colour will distract from the appearance of such a small house, but I might experiment a bit on a small corner of the roof. I was thinking that drybrushing with grey might make the roof look a bit weathered.
I spraypainted a coat of white primer onto the trim that I will use to trim off the edges of the roof gables, but I still need to paint it all with white emulsion to match the house.
I also spent three hours on Tuesday night relocating the house off of the dining table, and onto the little picnic table because DS had invited three friends over for Friday supper. It took quite a while to shovel through four months worth of accumulated tools, materials, paint bottles, wood scraps, wallpaper etc., and find new homes for it all. A lot of it is currently on the floor of my bedroom, in case I need it again during the remainder of the build. The little picnic table feels small and makes me feel sad that I don't have a proper studio to work in, but I expect I will get used to it. There aren't any really big messy jobs left now, just lots of trimming out to do, so I don't really need any more working room than I have.
I'm enjoying watching the Fairfield build on the Looking Glass Miniature blog. She has a neat idea for using fancy trim scissors to cut edging for shelves, fireplaces, windowseats etc. which I think I may have to copy, it looks really cool.
For such a little house, painting the shingles has felt a bit like painting the Forth bridge: endless. I've done several coats, only to turn the house to a new angle and discover new unpainted crevices. I've just finished what I hope is the definitive and final coat, and I put a bright worklamp between my eyes and my paintbrush, so that I could look extremely closely at the roof and really work the paint into all the cracks.
DS is suggesting that I add some realism by drybrushing the roof in a different colour, or highlighting some of the shingles in different shades of green. I'm a bit worried that introducing too much colour will distract from the appearance of such a small house, but I might experiment a bit on a small corner of the roof. I was thinking that drybrushing with grey might make the roof look a bit weathered.
I spraypainted a coat of white primer onto the trim that I will use to trim off the edges of the roof gables, but I still need to paint it all with white emulsion to match the house.
I also spent three hours on Tuesday night relocating the house off of the dining table, and onto the little picnic table because DS had invited three friends over for Friday supper. It took quite a while to shovel through four months worth of accumulated tools, materials, paint bottles, wood scraps, wallpaper etc., and find new homes for it all. A lot of it is currently on the floor of my bedroom, in case I need it again during the remainder of the build. The little picnic table feels small and makes me feel sad that I don't have a proper studio to work in, but I expect I will get used to it. There aren't any really big messy jobs left now, just lots of trimming out to do, so I don't really need any more working room than I have.
I'm enjoying watching the Fairfield build on the Looking Glass Miniature blog. She has a neat idea for using fancy trim scissors to cut edging for shelves, fireplaces, windowseats etc. which I think I may have to copy, it looks really cool.
Sunday, 12 September 2010
Shingling done, for better or for worse
I made a big push today on the shingling. The family went out for the day to a modelling show so I was able to put in about six hours on the dollshouse. I am relieved to report that all the shingles are now on, including the ridge tiles, and the first coat of paint applied. I will be honest and confess that I am not incredibly happy with how the main roof turned out. My row spacing is pretty erratic in some places. I'm thinking perhaps the inhabitants got their cousin the roofer to do the shingling job for them on the cheap (and perhaps he has a slight alcohol problem). My only excuse is that with these little shingles, small discrepancies soon build up into obvious faults. Also, if I were to do it all again, I would buy third-party shingles and not use the kit shingles, as they were pretty rubbish.
At the end of the shingling I still had a good half a bag of shingles left. If you put your rows closer together than I did mine, then you would use more, but there are still ample shingles supplied in the kit for the job.
After completing the wooden shingles on the roof, I moved on and shingled the porch roof.
Then I shingled the bay window roof, which was tricky because of the angles and small area to work on, plus having to notch the shingles around the vertical battens.
Ridge Treatment
While deciding how to finish the ridge of my main roof, I had a look at several other houses pictured in the gallery on the Greenleaf Forum to see what other people have done. There were a variety of treatments used:
At the end of the shingling I still had a good half a bag of shingles left. If you put your rows closer together than I did mine, then you would use more, but there are still ample shingles supplied in the kit for the job.
After completing the wooden shingles on the roof, I moved on and shingled the porch roof.
Then I shingled the bay window roof, which was tricky because of the angles and small area to work on, plus having to notch the shingles around the vertical battens.
Ridge Treatment
While deciding how to finish the ridge of my main roof, I had a look at several other houses pictured in the gallery on the Greenleaf Forum to see what other people have done. There were a variety of treatments used:
- butting the last row of shingles neatly against each other
- applying individual ridge tiles overlapping the roof ridge
- applying long horizontal lengths of trim along the ridge
- applying an ornamental 'gingerbread' fretwork along the ridge and butting the shingles up against this
- applying a long horizontal strip of folded card or paper along the ridge, to mimic roofing paper or flashing.
I also looked at the pictures I have of the original Pickett Hill house that I am copying, and it seems to use individual ridge tiles. So I decided to go with those. I used my quilting ruler to mark up thin card (from the back of a writing pad) into strips 3/8" wide (roughly the width of a narrow shingle) and 1/2" long (to overlap 1/4" on either side of ridge). Before cutting these out, I scored a line halfway along the length, so that each shingle would have a fold line.
I applied these to the house using Aleene's Thick Designer Tacky Glue, which is a super tacky thick white glue which works really well with card.
On the dormer, I cut the 3/8" strips into longer 1-inch lengths, with the fold scored at 1/2", so that the dormer ridge tiles overlap 1/2" on to either side of the dormer.
With all the shingling done, I applied a first coat of Anita's Leaf Green acrylic paint, using a pointed brush to carefully paint the areas touching the white walls, and a bigger brush for the main areas. This is going to take a few coats to achieve a uniform colour. Shingled roofs are one of those never-ending paint jobs where you think you have it all painted, then you turn it to a different angle and suddenly see all these crevices and bits you missed.
Curiously, I think the house looks smaller now than it did when the shingles were plain wood. Perhaps because the green has made them darker, as well as uniting the various surfaces into one roof.
Looking on the Greenleaf Forum gallery has left me with a major case of inadequacy. Some of the pictures on there are so detailed and so perfect that it is hard to tell they are of dollshouses and not of real rooms. I know my house is never going to look that perfect (particularly in unforgiving high definition photographs). I can only admire people who can achieve that level of detail, particularly in the half-inch scale. I have to remind myself that my original goal is to achieve a suitable home for my Lydia Pickett furniture, and that it's not a competition, and there are no Dollshouse Inspection Police!
Sunday, 5 September 2010
Shingling is killing my brain cells
I'm still shingling and so far this has to be the least enjoyable part of the build. As well as being fiddly, and slow, it is also incredibly annoying due to the size variation in the Greenleaf shingles. Dealing with too-short shingles and too-narrow shingles is throwing off my rows and my rhythm.
I am slowly working my way up the front/side roof. I am doing them all at the same time, so that the rows line up. This means that on every row I have to cut shingles to fit into the valleys around the dormer and between the two roofs. You can see my half-inch guidelines on the side roof. You can also see how uneven the tops of the shingle rows are due to the varying height of the shingles, grrrrrr.
I'm also not very happy with the spacing of my first three rows on the main roof. Now that I am several rows up, it is bugging me that the second row isn't centred between the starting row and the third row. However, I expect this will be less obvious once it's all painted.
Today I went to the Epsom Dollshouse Fair and picked up some sticks of wood 1.5mm x 5mm which will be my fascia boards to hide the front roof edges once the shingles are on and painted. I also got some 1/24 cornicing, but I thought it was rather expensive at .90p per wall-length piece. I got six sticks of coving and six sticks of cornicing, which should be enough for four rooms.
Monday, 30 August 2010
A shingle a day - gets the house off the dining table
Still slowly shingling.
As per my previous post, I extended the shingling line across the master bedroom cut-out, so that the right-hand shingle rows would be properly aligned.
When I reached the top of the master bedroom cut-out, I once again cut curved shingles for the corners, and ran a line of upside-down shingles across the top of the cut-out. Once the glue dried I trimmed the reversed shingles to the correct height.
I trimmed shingles to fit closely around the chimney.
And here is the finished side/back roof. You can see that I butted the top row of shingles up against the top row of the other roof. Once the glue dried, I trimmed off the projecting shingles with scissors along the roof peak, in preparation for applying ridge tiles once all the shingling is done.
Now I have started the front roof. Although I started the first row on the side roof at the usual 3/4", I have squeezed the next two rows a bit closer than 1/2". This is so that the third row lines up with the start of the shingling on the front roof and gives a continuous line.
First of all, I filled in the corner with some cut shingle, around the start of the front roof (this is a close up to the right of the dormer). You can see how far below the pencil line my shingles are.
By also starting the next row below the pencil line, it is going to line up with the start of the shingling on the front roof. Once I have a few rows done on both roofs, I will gradually revert to the correct pencil lines on the side roof. I need to do that so that the shingles on this side will match the shingling on the other side once I reached the roof peak. It would look odd if the last row was really short on one side of the peak and really long on the other.
As per my previous post, I extended the shingling line across the master bedroom cut-out, so that the right-hand shingle rows would be properly aligned.
When I reached the top of the master bedroom cut-out, I once again cut curved shingles for the corners, and ran a line of upside-down shingles across the top of the cut-out. Once the glue dried I trimmed the reversed shingles to the correct height.
I trimmed shingles to fit closely around the chimney.
And here is the finished side/back roof. You can see that I butted the top row of shingles up against the top row of the other roof. Once the glue dried, I trimmed off the projecting shingles with scissors along the roof peak, in preparation for applying ridge tiles once all the shingling is done.
Now I have started the front roof. Although I started the first row on the side roof at the usual 3/4", I have squeezed the next two rows a bit closer than 1/2". This is so that the third row lines up with the start of the shingling on the front roof and gives a continuous line.
First of all, I filled in the corner with some cut shingle, around the start of the front roof (this is a close up to the right of the dormer). You can see how far below the pencil line my shingles are.
By also starting the next row below the pencil line, it is going to line up with the start of the shingling on the front roof. Once I have a few rows done on both roofs, I will gradually revert to the correct pencil lines on the side roof. I need to do that so that the shingles on this side will match the shingling on the other side once I reached the roof peak. It would look odd if the last row was really short on one side of the peak and really long on the other.
Saturday, 21 August 2010
We resume our normal (shingling) programming
I'm back, and if you also read my main blog, you will know that not only have I survived the infamous Knit Camp, I have also returned soaking wet from Wales. After multiple loads of laundry yesterday, and attempting to dry our bits of awning out in the garden despite the fact that it is still spitting rain, I finally got some time today to return to my lonely Fairfield. Even my supportive husband has started to ask when we are going to get the dining table back, so I need to get moving on the shingling. I think once the shingling is done, I can swap over the picnic table that we are currently eating our meals at, with the dining table, and continue the house on the smaller picnic table.
I started out by shingling the rest of the back roof. As my lines of shingles drew nearer to the roof peak, I realised that I had a very flat peak where the two pieces of plywood met. The Pickett Hill (PH) house has very pointy roof peaks. To mimic this, I am going to butt my top line of shingles against each other before capping them. To help support this top line of shingles, I glued on some scrap cornice molding along the flat peak.
I cut the last row of shingles roughly to length by setting up a temporary stop on my cutting shears, before glueing these short shingles along the peak. I will need to trim this last line of shingles once the opposite peak is also glued on, to achieve an even line.
I have now started shingling the other back roof on the Fairfield, which includes a 'valley' where the back roof meets up with the side roof. I learned when shingling my Willowcrest that you can't just draw lines the same distance apart on two roofs that meet at a valley. If one roof is at a different angle, then the shingles just won't line up visually. I found the best way to do it was to designate one roof to be the 'main roof' on which you draw the spacing lines (this is probably the roof with the bigger area), and then line up the tips of the shingles on the second 'minor' roof to visually continue the shingle line. You can see what I mean on this picture of my Willowcrest dormer. The shingles on the dormer are longer, with more shingle exposed, because the dormer roof is at a steeper angle than the main mansard roof. Yet the shingle tips are lining up visually. I also found that for a neat result, I needed to shingle one row at a time on both roofs simultaneously. I couldn't do one roof, then go back and do the other roof.
1) So on the Fairfield, I have drawn the first line 3/4 of an inch up from the edge of the side roof, then further lines 1/2 an inch apart. This is my 'main roof'. In this pic I have shingled up to where the valley starts, and completed the first row of the main roof where it meets the valley. I fill in with cut shingles snugly into the valley 'crease'.
2) Then I start the first row of the valley, again butting a cut shingle snugly into the 'crease' of the valley.
3) Then I do the second row of the 'main' roof. This time I am going to butt a ruler up against the tips of my second line of shingles, and mark a continuation of this line onto the secondary roof.
4) Then I place the second row of the secondary roof, aligning the tip of the shingle with the line I drew in Step 3. Again, I cut part shingles to fill the gap in snugly to the valley. As the cut pieces aren't overlapping another shingle, they will lie slightly flatter, but don't worry about this as it will mostly be hidden by subsequent rows.
5) The third row is just a repeat of Steps 3 and 4. On the secondary roof, I am now starting to stagger my shingle tips so that the tips line up with the seam in the row below.
I started out by shingling the rest of the back roof. As my lines of shingles drew nearer to the roof peak, I realised that I had a very flat peak where the two pieces of plywood met. The Pickett Hill (PH) house has very pointy roof peaks. To mimic this, I am going to butt my top line of shingles against each other before capping them. To help support this top line of shingles, I glued on some scrap cornice molding along the flat peak.
I cut the last row of shingles roughly to length by setting up a temporary stop on my cutting shears, before glueing these short shingles along the peak. I will need to trim this last line of shingles once the opposite peak is also glued on, to achieve an even line.
Shingling the valley
Now, the tricky part of this process is that when I reach the top of the master bedroom cut-out, my row of shingles on the secondary roof will need to extend across the top of the master bedroom cut-out to reach the edge of the secondary roof. It will need to do so in a logical pattern continuation of the rows of shingles coming up the right side of the master bedroom cut-out. As this right side of the secondary roof starts at a lower point than the valley side on the left, I am going to need to do some fudging to ensure that my shingle rows will line up. I am going to do a few more rows like Step 5 until I have enough of a pattern that I can extend the lines across the cut-out space to the right hand roof, using my quilting ruler. Then I can draw lines lower down on the right-hand side, adding or subtracting smidgens from my usual half-inch separation, to make the shingle rows work out visually on the right hand side. And I bet all that is clear as mud... :)
Sunday, 8 August 2010
A short break
I am off to Knit Camp in Stirling, Scotland, so am not going to be able to work on my dollshouse, nor to blog, for a week or two. And I've been busy getting ready this week (insane decision to knit a fair isle vest in time to wear it at the camp) so haven't done much shingling.
Following my successful shingle test last week, I made a start on shingling the back roof. I immediately found that there are some problems with the measurements of the supplied kit shingles.
1) A significant number of shingles are up to 1/8" shorter in length. This means that you can't just butt the shingles up to the pencil line, you have to watch that they are lining up at the bottom correctly.
2) A significant number of shingles are slightly narrower (as per the shingle on the right on the top row in the picture). This is leading to alignment problems between my rows. I've had to fudge a few rows to nudge the points of the shingles back into line with the seams of the row below. It seems to be the way the shingles are punched, because a couple of times I've found a fat shingle still joined to a thin shingle from the manufacturing process.
When I reached the point where the back roof cut out begins, I had to decide whether to maintain the clean line of the cut-out, or whether to overhang the points of the shingles. I decided to maintain the clean line, as this is how the Pickett Hill house is.
To go around the corner, I shaped one shingle into a curve by drawing the curve in pencil from behind, then trimming carefully with small scissors.
Across the top of the cut-out, I am running a row of upside down shingles, butting the square end to the top of the opening. Once the glue dries, I will cut the shingles off at the pencil line using a straight edge and knife. This is quicker than cutting individual shingles to length, and easy to do as the shingles are so thin.
So that's it - hope you are all having a great summer!
Following my successful shingle test last week, I made a start on shingling the back roof. I immediately found that there are some problems with the measurements of the supplied kit shingles.
1) A significant number of shingles are up to 1/8" shorter in length. This means that you can't just butt the shingles up to the pencil line, you have to watch that they are lining up at the bottom correctly.
2) A significant number of shingles are slightly narrower (as per the shingle on the right on the top row in the picture). This is leading to alignment problems between my rows. I've had to fudge a few rows to nudge the points of the shingles back into line with the seams of the row below. It seems to be the way the shingles are punched, because a couple of times I've found a fat shingle still joined to a thin shingle from the manufacturing process.
When I reached the point where the back roof cut out begins, I had to decide whether to maintain the clean line of the cut-out, or whether to overhang the points of the shingles. I decided to maintain the clean line, as this is how the Pickett Hill house is.
To go around the corner, I shaped one shingle into a curve by drawing the curve in pencil from behind, then trimming carefully with small scissors.
Across the top of the cut-out, I am running a row of upside down shingles, butting the square end to the top of the opening. Once the glue dries, I will cut the shingles off at the pencil line using a straight edge and knife. This is quicker than cutting individual shingles to length, and easy to do as the shingles are so thin.
So that's it - hope you are all having a great summer!
Subscribe to:
Posts (Atom)